The City of Marengo requires that a building permit be submitted for review by the Zoning Administrator, prior to beginning construction. The Zoning Administrator will review building plans against City Code.
In addition to the building permit, a drawing of the planned construction is to be provided. The drawing should include:
Location of the principal structure
Dimensions, including height, of the structure
Distance of all setbacks from the lot lines.
Click on the links below for a copy of the Building Permit and an Overview of Zoning Requirements.